Posts by Corey Staley
Integrity EPC In-Line Inspection Process
At Integrity EPC, we understand how valuable an operators’ time is. In-line inspection can be a very time consuming project with many components, which is why we can came up with a streamlined process to make sure everything is evaluated and accounted for. Below is a look into our process: Assess the pipeline to determine…
Read MorePrevention and Mitigation Measures
Problem:A client’s pipeline system was initially built in 2016 with multiple new lines being constructed and placed into operation in the years thereafter. Most of the operational history while the pipeline was owned and operated by the previous owner is not available, so the historical parameters for consideration during this evaluation are limited to year…
Read MoreHCA & MCA Support
ProblemLiquid and gas operators must identify if their existing HCAs need modifications on an annual basis. Sometimes the parameters of operating pressure and volume change or new structures are built near the pipeline. What is a simple method for calculating these properly? Furthermore, the new regulations indicate the need to determine the Moderate Consequence Areas…
Read MoreAnnual Integrity Management Support
ProblemA small private equity backed operator needed support on annual integrity management and DOT compliance tasks but did not have the resources in house to complete these. Our client does not have the budget to hire a full-time resource and their current team already has a full workload on their plate. Approach and SolutionAt Integrity…
Read MoreBlue Hawk-PSM Mechanical Integrity & COGCC 609 Compliance Case Study
ProblemA Client needed a vendor to host, manage, and analyze all upcoming facility inspection data on an acquired asset that did not have an Inspection Data Management System (IDMS) in place. One of the biggest problems the Client faced was finding a simple software platform that could be tailored to their system. Big clunky systems…
Read MoreTraceable, Verifiable, and Complete MAOP Records
The Problem/Approach:After passage of the Part 192 mega rule, many pipeline operators understood they needed to not only develop a plan for compliance with the new regulation, but they also needed to begin the process of gathering their records to understand where their traceable, verifiable, and complete (TVC) data gaps existed. Based on the gap…
Read MoreLooking at the Metrics with Orbital Survey Module Streamlined Workflow
When we talk about data management using Survey Module, we are really talking about the moment we begin uploading survey data into the Orbital web portal. As all you know, most of the data management begins in the office and your processes can make or break your project coming in under budget. Additionally, 90% of…
Read MoreILI Data Alignment and Analysis
Problem Our Client requested In-Line-Inspection (ILI) reports to be reviewed and to “align” ILI vendor data reports to as-built pipeline records in GIS. For this example, the ILI vendor used “Magnetic Flux Leakage Technology” to detect and characterize internal and external metal loss features. Integrity EPC’s Data Management and GIS team has been tasked with…
Read MoreOn Demand ILI Engineering Support
Problem/Approach Our client has a lot of integrity related work and was struggling to find a good candidate to fill an Integrity Engineer position. Integrity EPC has the expertise and the bandwidth to provide an on-demand Integrity/ILI Engineer to our client to support their on-going operational needs. Execution Our Integrity/ILI Engineer provided the services below:…