Gas Transmission Pipeline Compliance Survey

Problem: In order to comply with DOT PHMSA 49 CFR 192 regulations, a gas transmission pipeline operator needed the following O&M compliance survey services completed on 35 miles of pipeline: Right-of-way inspection; DOT 192.705, DOT 192.707 Leak detection survey; DOT 192.706 Cathodic protection survey; DOT 192.465 Class location verification; DOT 192.5 In an effort to…

Read More

DOT PHMSA 49 CFR 195 Integrity Program Implementation

Problem: In order to comply with DOT PHMSA 49 CFR 195 regulations, Midstream Client needed a high consequence area (HCA) analysis performed on their pipeline system.  The results of the analysis determined their system had some “could affect” segments and therefore would need to comply with §195.452 Pipeline integrity management in high consequence areas.  The client was…

Read More

New Pipeline Construction QAQC NACE Coating Inspection

Problem: Integrity EPC Client hired a pipeline construction contractor to install a new pipeline system for their business needs.  DOT requirements and NACE recommended best practices state a joint coating must be used to prevent external corrosion and support cathodic protection.  Client requested a 3rd party inspection to oversee the application of the coating epoxy at the…

Read More