Case Studies

Home / About / Case Studies

Making a Difference

How We Succeed

Integrity EPC In-Line Inspection Process

At Integrity EPC, we understand how valuable an operators’ time is. In-line inspection can be a very time consuming project…

Read More

Prevention and Mitigation Measures

Problem:A client’s pipeline system was initially built in 2016 with multiple new lines being constructed and placed into operation in…

Read More

HCA & MCA Support

ProblemLiquid and gas operators must identify if their existing HCAs need modifications on an annual basis. Sometimes the parameters of…

Read More

Annual Integrity Management Support

ProblemA small private equity backed operator needed support on annual integrity management and DOT compliance tasks but did not have…

Read More

Blue Hawk-PSM Mechanical Integrity & COGCC 609 Compliance Case Study

ProblemA Client needed a vendor to host, manage, and analyze all upcoming facility inspection data on an acquired asset that…

Read More

Traceable, Verifiable, and Complete MAOP Records

The Problem/Approach:After passage of the Part 192 mega rule, many pipeline operators understood they needed to not only develop a…

Read More

Looking at the Metrics with Orbital Survey Module Streamlined Workflow

When we talk about data management using Survey Module, we are really talking about the moment we begin uploading survey…

Read More

ILI Data Alignment and Analysis

Problem Our Client requested In-Line-Inspection (ILI) reports to be reviewed and to “align” ILI vendor data reports to as-built pipeline…

Read More

On Demand ILI Engineering Support

Problem/Approach Our client has a lot of integrity related work and was struggling to find a good candidate to fill…

Read More

Phase 2 Equipment Documentation Development and Field Inspections for Mechanical Integrity Program

Task 1 – Mechanical Integrity TML/CML Nomination  CML assignment needed be determined according to the rate and method of anticipated…

Read More