Making a Difference
How We Succeed
Traceable, Verifiable, and Complete MAOP Records
The Problem/Approach:After passage of the Part 192 mega rule, many pipeline operators understood they needed to not only develop a…
Read MoreLooking at the Metrics with Orbital Survey Module Streamlined Workflow
When we talk about data management using Survey Module, we are really talking about the moment we begin uploading survey…
Read MoreILI Data Alignment and Analysis
Problem Our Client requested In-Line-Inspection (ILI) reports to be reviewed and to “align” ILI vendor data reports to as-built pipeline…
Read MoreOn Demand ILI Engineering Support
Problem/Approach Our client has a lot of integrity related work and was struggling to find a good candidate to fill…
Read MorePhase 2 Equipment Documentation Development and Field Inspections for Mechanical Integrity Program
Task 1 – Mechanical Integrity TML/CML Nomination CML assignment needed be determined according to the rate and method of anticipated…
Read MorePipeline Integrity Engineer Training
The Problem A client had a new pipeline integrity engineer that needed more in-depth training on 195.452. Approach Integrity EPC…
Read MoreGas Pipeline Integrity Management Program Development for Newly Constructed Pipeline
The Problem The client sought support developing and implementing a new gas pipeline integrity management plan for a newly constructed…
Read MoreControl Room Management Implementation
The Problem The Client needed to know if their DOT regulated gathering system needed to meet the Control Room Management…
Read MoreO&M Manual And DOT Field Survey
The Problem Client had a jurisdictional analysis completed on their system and it was determined their system needed an O&M Manual that would comply…
Read MoreMechanical Integrity Field Implementation
The Problem Client was out of compliance regarding state and federal requirements related to their Mechanical Integrity program, and external…
Read More