Case Studies

Home / About / Case Studies

Making a Difference

How We Succeed

Pipeline Integrity Engineer Training

The Problem A client had a new pipeline integrity engineer that needed more in-depth training on 195.452. Approach Integrity EPC…

Read More

Gas Pipeline Integrity Management Program Development for Newly Constructed Pipeline

The Problem The client sought support developing and implementing a new gas pipeline integrity management plan for a newly constructed…

Read More

Control Room Management Implementation

The Problem The Client needed to know if their DOT regulated gathering system needed to meet the Control Room Management…

Read More

O&M Manual And DOT Field Survey

The Problem Client had a jurisdictional analysis completed on their system and it was determined their system needed an O&M Manual that would comply…

Read More

Mechanical Integrity Field Implementation

The Problem Client was out of compliance regarding state and federal requirements related to their Mechanical Integrity program, and external…

Read More

COGCC Flowline Registration

The ProblemAs the Colorado Oil and Gas Conservation Commission (COGCC) has now started to enforce more requirements for operators on…

Read More

ILI Procedures and Vendor Profiles

The Problem A client needed procedures and forms for running ILI tools and interacting with pig vendors. They also needed…

Read More

Tank Spill – Fit To Service

The Problem Due to a minor failure on an in-service tank approximately 1,500 gallons of condensate were released into secondary…

Read More

Gas Transmission Pipeline Compliance Survey

Problem: In order to comply with DOT PHMSA 49 CFR 192 regulations, a gas transmission pipeline operator needed the following…

Read More

DOT PHMSA 49 CFR 195 Integrity Program Implementation

Problem: In order to comply with DOT PHMSA 49 CFR 195 regulations, Midstream Client needed a high consequence area (HCA)…

Read More