Making a Difference
How We Succeed
Pipeline Integrity Engineer Training
The Problem A client had a new pipeline integrity engineer that needed more in-depth training on 195.452. Approach Integrity EPC…
Read MoreGas Pipeline Integrity Management Program Development for Newly Constructed Pipeline
The Problem The client sought support developing and implementing a new gas pipeline integrity management plan for a newly constructed…
Read MoreControl Room Management Implementation
The Problem The Client needed to know if their DOT regulated gathering system needed to meet the Control Room Management…
Read MoreO&M Manual And DOT Field Survey
The Problem Client had a jurisdictional analysis completed on their system and it was determined their system needed an O&M Manual that would comply…
Read MoreMechanical Integrity Field Implementation
The Problem Client was out of compliance regarding state and federal requirements related to their Mechanical Integrity program, and external…
Read MoreCOGCC Flowline Registration
The ProblemAs the Colorado Oil and Gas Conservation Commission (COGCC) has now started to enforce more requirements for operators on…
Read MoreILI Procedures and Vendor Profiles
The Problem A client needed procedures and forms for running ILI tools and interacting with pig vendors. They also needed…
Read MoreTank Spill – Fit To Service
The Problem Due to a minor failure on an in-service tank approximately 1,500 gallons of condensate were released into secondary…
Read MoreGas Transmission Pipeline Compliance Survey
Problem: In order to comply with DOT PHMSA 49 CFR 192 regulations, a gas transmission pipeline operator needed the following…
Read MoreDOT PHMSA 49 CFR 195 Integrity Program Implementation
Problem: In order to comply with DOT PHMSA 49 CFR 195 regulations, Midstream Client needed a high consequence area (HCA)…