Case Studies

Home / About / Case Studies

Making a Difference

How We Succeed

HCA & MCA Support

ProblemLiquid and gas operators must identify if their existing HCAs need modifications on an annual basis. Sometimes the parameters of…

Read More

Annual Integrity Management Support

ProblemA small private equity backed operator needed support on annual integrity management and DOT compliance tasks but did not have…

Read More

Blue Hawk-PSM Mechanical Integrity & COGCC 609 Compliance Case Study

ProblemA Client needed a vendor to host, manage, and analyze all upcoming facility inspection data on an acquired asset that…

Read More

Traceable, Verifiable, and Complete MAOP Records

The Problem/Approach:After passage of the Part 192 mega rule, many pipeline operators understood they needed to not only develop a…

Read More

Looking at the Metrics with Orbital Survey Module Streamlined Workflow

When we talk about data management using Survey Module, we are really talking about the moment we begin uploading survey…

Read More

ILI Data Alignment and Analysis

Problem Our Client requested In-Line-Inspection (ILI) reports to be reviewed and to “align” ILI vendor data reports to as-built pipeline…

Read More

On Demand ILI Engineering Support

Problem/Approach Our client has a lot of integrity related work and was struggling to find a good candidate to fill…

Read More

Phase 2 Equipment Documentation Development and Field Inspections for Mechanical Integrity Program

Task 1 – Mechanical Integrity TML/CML Nomination  CML assignment needed be determined according to the rate and method of anticipated…

Read More

Pipeline Integrity Engineer Training

The Problem A client had a new pipeline integrity engineer that needed more in-depth training on 195.452. Approach Integrity EPC…

Read More

Gas Pipeline Integrity Management Program Development for Newly Constructed Pipeline

The Problem The client sought support developing and implementing a new gas pipeline integrity management plan for a newly constructed…

Read More