Making a Difference
How We Succeed
Prevention and Mitigation Measures
Problem:A client’s pipeline system was initially built in 2016 with multiple new lines being constructed and placed into operation in…
HCA & MCA Support
ProblemLiquid and gas operators must identify if their existing HCAs need modifications on an annual basis. Sometimes the parameters of…
Annual Integrity Management Support
ProblemA small private equity backed operator needed support on annual integrity management and DOT compliance tasks but did not have…
Blue Hawk-PSM Mechanical Integrity & COGCC 609 Compliance Case Study
ProblemA Client needed a vendor to host, manage, and analyze all upcoming facility inspection data on an acquired asset that…
Traceable, Verifiable, and Complete MAOP Records
The Problem/Approach:After passage of the Part 192 mega rule, many pipeline operators understood they needed to not only develop a…
Looking at the Metrics with Orbital Survey Module Streamlined Workflow
When we talk about data management using Survey Module, we are really talking about the moment we begin uploading survey…
ILI Data Alignment and Analysis
Problem Our Client requested In-Line-Inspection (ILI) reports to be reviewed and to “align” ILI vendor data reports to as-built pipeline…
On Demand ILI Engineering Support
Problem/Approach Our client has a lot of integrity related work and was struggling to find a good candidate to fill…
Phase 2 Equipment Documentation Development and Field Inspections for Mechanical Integrity Program
Task 1 – Mechanical Integrity TML/CML Nomination CML assignment needed be determined according to the rate and method of anticipated…
Pipeline Integrity Engineer Training
The Problem A client had a new pipeline integrity engineer that needed more in-depth training on 195.452. Approach Integrity EPC…
