At Integrity EPC, we understand how valuable an operators’ time is. In-line inspection can be a very time consuming project with many components, which is why […]
Problem:A client’s pipeline system was initially built in 2016 with multiple new lines being constructed and placed into operation in the years thereafter. Most of the […]
ProblemLiquid and gas operators must identify if their existing HCAs need modifications on an annual basis. Sometimes the parameters of operating pressure and volume change or […]
ProblemA small private equity backed operator needed support on annual integrity management and DOT compliance tasks but did not have the resources in house to complete […]
ProblemA Client needed a vendor to host, manage, and analyze all upcoming facility inspection data on an acquired asset that did not have an Inspection Data […]
The Problem/Approach:After passage of the Part 192 mega rule, many pipeline operators understood they needed to not only develop a plan for compliance with the new […]
When we talk about data management using Survey Module, we are really talking about the moment we begin uploading survey data into the Orbital web portal. […]
Problem Our Client requested In-Line-Inspection (ILI) reports to be reviewed and to “align” ILI vendor data reports to as-built pipeline records in GIS. For this example, […]
Problem/Approach Our client has a lot of integrity related work and was struggling to find a good candidate to fill an Integrity Engineer position. Integrity EPC […]