November 20, 2019

Phase 2 Equipment Documentation Development and Field Inspections for Mechanical Integrity Program

Task 1 – Mechanical Integrity TML/CML Nomination  CML assignment needed be determined according to the rate and method of anticipated damage. Integrity EPC (IEPC) utilized their […]
November 5, 2019

Pipeline Integrity Engineer Training

The Problem A client had a new pipeline integrity engineer that needed more in-depth training on 195.452. Approach Integrity EPC created a 195.452 training to incorporate […]
September 17, 2019

Gas Pipeline Integrity Management Program Development for Newly Constructed Pipeline

The Problem The client sought support developing and implementing a new gas pipeline integrity management plan for a newly constructed pipeline in Texas and another gas […]
September 4, 2019

Control Room Management Implementation

The Problem The Client needed to know if their DOT regulated gathering system needed to meet the Control Room Management (CRM) regulations in the 49 CFR […]
September 4, 2019

O&M Manual And DOT Field Survey

The Problem Client had a jurisdictional analysis completed on their system and it was determined their system needed an O&M Manual that would comply with 49 CFR 192 Department of […]
September 4, 2019

Mechanical Integrity Field Implementation

The Problem Client was out of compliance regarding state and federal requirements related to their Mechanical Integrity program, and external inspection intervals. The Client acquired assets […]
August 14, 2019

COGCC Flowline Registration

The ProblemAs the Colorado Oil and Gas Conservation Commission (COGCC) has now started to enforce more requirements for operators on their flowlines within Colorado, clients are […]
July 2, 2019

ILI Procedures and Vendor Profiles

The Problem A client needed procedures and forms for running ILI tools and interacting with pig vendors. They also needed qualified staff to complete the work […]
June 17, 2019

Tank Spill – Fit To Service

The Problem Due to a minor failure on an in-service tank approximately 1,500 gallons of condensate were released into secondary containment. As a result of the […]