Task 1 – Mechanical Integrity TML/CML Nomination CML assignment needed be determined according to the rate and method of anticipated damage. Integrity EPC (IEPC) utilized their […]
The Problem A client had a new pipeline integrity engineer that needed more in-depth training on 195.452. Approach Integrity EPC created a 195.452 training to incorporate […]
The Problem The client sought support developing and implementing a new gas pipeline integrity management plan for a newly constructed pipeline in Texas and another gas […]
The Problem The Client needed to know if their DOT regulated gathering system needed to meet the Control Room Management (CRM) regulations in the 49 CFR […]
The Problem Client had a jurisdictional analysis completed on their system and it was determined their system needed an O&M Manual that would comply with 49 CFR 192 Department of […]
The Problem Client was out of compliance regarding state and federal requirements related to their Mechanical Integrity program, and external inspection intervals. The Client acquired assets […]
The ProblemAs the Colorado Oil and Gas Conservation Commission (COGCC) has now started to enforce more requirements for operators on their flowlines within Colorado, clients are […]
The Problem A client needed procedures and forms for running ILI tools and interacting with pig vendors. They also needed qualified staff to complete the work […]
The Problem Due to a minor failure on an in-service tank approximately 1,500 gallons of condensate were released into secondary containment. As a result of the […]